After you check your property
An answer. Then a useful next step.
Choose the guide that matches your map result. Read the details, take a question to the right planning office, and decide whether email updates would help.
No email is needed to read any guide.
Your next step · City · inside the mapped band
Before you build, repair or rebuild.
An inside-band result raises different questions for an existing home, an addition and a new building. Start with the answers below, then ask the City to confirm how the rules would apply to your plans.
Your guide is here to read. No email needed.
Questions that match this result
Can my existing house stay?per draft ordinance
Yes. Legally built homes and structures continue as nonconforming structures under city code chapter 20.212, which the draft leaves in place. Nothing requires you to move, remove, or plant anything on day one. The new rules apply when you apply for a permit to build, expand, or rebuild. If adopted Oct 28, the ordinance takes effect Dec 31, 2026.
Can I repair or maintain what I have?per draft ordinance
Yes. The draft allows maintenance and repair of existing buildings, fences, roads and utilities as long as the work does not encroach further into the buffer, and lets you keep mowing, weeding, pruning, gardening, and maintaining pathways and patios as they existed before adoption. Fences can be replaced or newly built.
Can I add on, or build a shop, shed, ADU, or new patio inside the band?not yet confirmed
The draft says new structures must be outside the buffer and the 15-foot setback, and it has no rule for additions to homes already inside the band. Existing city code (20.212) lets a nonconforming building extend along its existing line but not closer to the stream. Whether a landward addition or ADU on a house inside the band will be allowed, or will need a critical-areas report and a buffer reduction (averaging and enhancement reductions both stop at 75 feet on a 100-foot buffer; a separate rule lets the director exclude buffer areas cut off by pavement or buildings) or a reasonable-use exception, has not been answered in writing. A new patio or uncovered deck is allowed in the 15-foot setback but not in the buffer.
If my house burns down, can I rebuild?per existing city code
Yes, if you apply within six months. The draft itself is silent and defers to existing city code 20.212, which says a damaged nonconforming structure loses its grandfathered status unless a building-permit application to repair or rebuild is filed within six months of the damage. Under that same existing code, reconstruction costing more than 25% of replacement value also needs a conditional-use permit. Miss the six-month window and the structure loses its grandfathered status, so a rebuild would have to meet the new 100-foot buffer and setback. The draft adds no fix, although residents and a commissioner asked for one at the Sept 14 hearing.
One useful step today
Ask Walla Walla Development Services
Start with this question. Add your property and project details when you contact the planning office.
For the work I am planning, which existing-code and draft provisions apply? Please identify the relevant sections and explain any permit or exception I would need.
Check the original sources
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · City · near the mapped edge
Find the real line before making plans.
A result near the edge needs a closer look. Read how the mapped line differs from the regulated starting point, and ask what is needed to locate that line on your property.
Your guide is here to read. No email needed.
Questions that match this result
Why might I still be affected?per draft ordinance
The regulated buffer starts at the ordinary high water mark (the edge of the channel), top of bank, or channel migration zone, not the centerline shown here, so it extends farther than this map draws. Only a field survey by a qualified professional sets the real line, and the City has published no parcel list.
What is the 15-foot setback?per draft ordinance
The draft requires buildings to sit 15 feet back from the buffer edge, up from 5 feet today; the director can reduce it to 5 feet with a critical-areas report. Landscaping, uncovered decks, roof overhangs up to 24 inches, walkways, patios, and rain gardens are allowed in that setback; buildings are not.
One useful step today
Ask Walla Walla Development Services
Start with this question. Add your property and project details when you contact the planning office.
What starting point and setback would you use for my property, and what survey or report would establish them before I design a project?
Check the original sources
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · City · outside the mapped band
Know what this result does—and does not—answer.
The map result is a starting point, not a permit clearance. If you have work in mind, check other applicable rules with the City. You can also take part in the broader proposal discussion.
Your guide is here to read. No email needed.
Questions that match this result
Why should I care?per draft ordinance
The City's own consultant (Facet, July 2026, in the Council packet) says the buffer area nearly triples, from 269 to 757 acres (2.1% to 5.8% of the city), on 43.2 stream miles. Our count on the City's own GIS layers shows about 1,490 parcels inside city limits touching the band on mapped creeks, up from about 980 at today's 35 feet. The City must plan for 2,348 new homes by 2046, state middle-housing, ADU and lot-split laws exclude lots inside critical-area buffers, and no one has counted what the band subtracts.
Did the City's own Planning Commission support this?per draft ordinance
No. On Sept 14, 2026, after 13 people testified, the Planning Commission voted 7-0 to recommend that Council direct staff to revise the draft to fit the City's infill goals using 'available science matching local conditions.' The draft posted Oct 9 is unchanged: 100 feet on every creek.
One useful step today
Ask Walla Walla Development Services
Start with this question. Add your property and project details when you contact the planning office.
Are there other mapped or site-specific critical areas that I should check before planning work on this property?
Check the original sources
- City of Walla Walla, Critical Areas Ordinance project page (hearing Oct 14, adoption Oct 28, effective Dec 31, 2026) ↗
- 2026 Draft Critical Areas Code Amendments Table, updated Oct 9, 2026 (Council packet, Item 6E) ↗
- Planning Commission draft minutes, Sept 14, 2026 (7-0 recommendation to revise the draft) ↗
- Facet, Stream Buffer Analysis memo, July 1, 2026 (43.2 stream miles; 268.8 to 757.4 acres) ↗
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · County · working buffer map
Start with the County rules for your land.
Your result uses the County working map. Read what that layer can tell you, what still needs confirmation, and which question to take to County planning.
Your guide is here to read. No email needed.
Questions that match this result
Is this the County's proposal?typical in WA CAOs
It is the County's working GIS layer, not an adopted rule. Treat it as the best available preview until the County publishes its draft.
Why is my creek drawn differently here?per draft ordinance
Inside city limits the map uses the City's layer; outside it uses the County's. They are different datasets with different rules.
Will the County do the same thing?typical in WA CAOs
The County has not published a draft yet. Its August 2026 buffer map is tiered rather than one width. Watch for its hearing dates this fall.
One useful step today
Ask Walla Walla County planning
Start with this question. Add your property and project details when you contact the planning office.
Which adopted buffer rule applies to my property today? How does it compare with the working GIS layer, and where can I follow proposed changes and hearing notices?
Check the original sources
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · Outside Walla Walla city limits
Confirm the jurisdiction, then the rule.
The Walla Walla City proposal is not a County-wide rule. Use the map’s jurisdiction line to identify the right planning office before applying a City explanation to your property.
Your guide is here to read. No email needed.
Questions that match this result
Will the County do the same thing?typical in WA CAOs
The County has not published a draft yet. Its August 2026 buffer map is tiered rather than one width. Watch for its hearing dates this fall.
Is this the County's proposal?typical in WA CAOs
It is the County's working GIS layer, not an adopted rule. Treat it as the best available preview until the County publishes its draft.
One useful step today
Ask the planning office for your jurisdiction
Start with this question. Add your property and project details when you contact the planning office.
Is this property in an incorporated city or unincorporated County land, and which adopted critical-areas rules apply?
Check the original sources
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · Mill Creek · shoreline rules
Ask about the shoreline rules for your reach.
Your map result includes a Mill Creek note. Start with the separate shoreline explanation, then ask the City which provisions apply at your reach and to the work you have in mind.
Your guide is here to read. No email needed.
Questions that match this result
What about Mill Creek?per draft ordinance
Mill Creek is regulated under the City's Shoreline Master Program, not the proposed Critical Areas Ordinance. The SMP sets a 35-foot buffer along the flood channel (Gose St to the Bennington Lake diversion) and shoreline jurisdiction extends 200 feet; the 100-foot creek buffer in the draft does not apply here.
One useful step today
Ask Walla Walla Development Services
Start with this question. Add your property and project details when you contact the planning office.
Which Shoreline Master Program provisions, shoreline jurisdiction and buffers apply to my reach of Mill Creek and the work I am considering?
Check the original sources
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · College Place · separate city code
Get an answer from College Place.
Use the College Place explanation for this result. The absence of a buffer polygon on CreekChecker is not a clearance to build; take your property and project questions to College Place Planning.
Your guide is here to read. No email needed.
Questions that match this result
Why is nothing drawn on my lot?not yet confirmed
College Place publishes no public GIS buffer layer. The County-mapped creek lines are shown for orientation only; the County's working buffer does not apply inside College Place.
Is College Place updating its code too?typical in WA CAOs
Every Growth Management Act city in the county is on the same Dec 31, 2026 periodic-update deadline, but we have not found a College Place draft. Ask College Place Planning.
One useful step today
Ask College Place Planning
Start with this question. Add your property and project details when you contact the planning office.
Which current critical-areas rules apply to my property and proposed work? Where can I review any draft changes or participation dates?
Read the map’s data and jurisdiction limits.
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · City · comparison width selected
Separate your comparison from the proposal.
You selected a comparison width on the map. It does not change the City draft. Return to the 100-ft view to compare the proposed band, then read the guide for that result. The map does not establish a surveyed or permitted boundary.
Your guide is here to read. No email needed.
One useful step today
Ask Walla Walla Development Services
Start with this question. Add your property and project details when you contact the planning office.
Which adopted and proposed provisions should I compare for my intended work, and where would the regulated line be measured on my property?
Check the original sources
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take partYour next step · Another incorporated city
Start with your own city’s planning office.
This guide does not apply Walla Walla’s proposal or College Place’s code to another city. Use the jurisdiction named in your map result and ask that city for the rules and sources.
Your guide is here to read. No email needed.
One useful step today
Ask your city’s planning office
Start with this question. Add your property and project details when you contact the planning office.
Which adopted critical-areas rules and any proposed changes apply in this city, and how can I comment on them?
Read the map’s data and jurisdiction limits.
This follows a map-result category, not a site-specific permit decision. A point check is not a whole-parcel finding. Read the method and limits.
Follow what happens next.
Choose updates about this topic and opportunities to comment. Reading this guide does not add you to a list.
Choose my email updates ↓Other ways to take part